Case Studies

Sheridan Suites

Project Name: Sheridan Suites

Location: 311 N. University Drive, Plantation, FL 33324

Property Type: 10 Story Hotel

Synopsis: Fire pump located in adjacent garage scheduled for demolition. New fire pump building would not be completed prior to demolition.

Solution: Install a temporary – Diesel Fire Pump

  1. Installation of a Temporary Diesel Fire Pump.
  2. Supply water to the pump from an adjacent hydrant.
  3. Add a tee and check valve to the existing Fire Department Connection – back feed the FDC from the Temp pump.
  4. Electric is provided from house power – a dedicated circuit for the Controller, and control wire to jockey Pump and JP controller.
  5. We will test the Fire pump from the test header and roof manifolds.

Covanta Energy

Okahumpka, Florida

Interplex

Tamarac, Florida

Marriott Beachplace Towers

Fort Lauderdale, Florida

Toscana Condos

Highland Beach, Florida

New Orleans Hotel

New Orleans, Louisiana

Riverside Medical Center

Sarasota, Florida

LG Distribution Center

Clarkesville, TN

Days Inn

Orlando, Florida

AHJ Training

Orlando, Florida

St. Regis

Bal Harbour, Florida
High Rise

The Estates At Carpenters

Lakeland, Florida

Vi at Aventura

Aventura, Florida
Senior Living Facility

Home Depot

Marathon Florida Home
Improvement Store

Sheridan Suites

Plantation, Florida
10 Story Hotel

Brickell Key

Miami, Florida
Condominium

Allegro

Parkland, Florida
Senior Living Facility

Iconbay Tower

Miami, Florida
43 Story High Rise

Fashion Mall

Plantation
Florida

Contact Us