Daskk Hotel

Project Name: Daskk Hotel

Location:7400 Canada Avenue, Orlando, FL 32819

Project Type: Apartment/Retail Building

Synopsis: The site was under construction and the existing fire pump failed to provide adequate service.

Details: We met with the Project Manager on site and discovered the local AHJ would not provide a CO without an operating fire pump. We immediately began the paperwork and logistics to supply a temporary diesel fire pump in a timely manner. 

Solution: Rentfirepumps.com was able to provide a temporary diesel fire pump to supply the site’s demand.  The local AHJ witnessed full capacity flow test and confirmed that the mobile unit met the fire sprinkler system(s) requirements and provided the CO needed to open the doors to the public.

Temporary Fire Pump: Diesel 1,000 GPM @ 100 PSI – FP Controller (110 v) – Jockey Pump – JP Controller – Test Header –Discharge – Pressure relief valve (Dial in the required pressure) – Day Tank – Low Fuel Alarm

Daskk Hotel: https://www.choicehotels.com/florida/orlando/ascend-hotels/fl280